Scala
Project Location: Bath
Project Contractor: Spec Projects
Project Value (C&I): £600k
Project Duration: 9 months (January 2023 – Sept 2023)
Project Scope: Mixed development of new and conversion of existing building into Student Accommodation, Retail Space and Dance Studio in Bath. Construction works consist of new Metal Stud Partitions, Walling Linings, upgrade of existing building, MF ceilings and plaster finish throughout.

College Green
Project Location: Bristol
Project Contractor: Spec Projects
Project Value (C&I): £250k
Project Duration: 32 weeks (April 2022 – Nov 2022)
Project Scope: Conversion of existing building into Student Accommodation in central Bristol. Construction works consisted of new Internal Metal Stud Partitions, upgrade of existing walls with Insulated Wall Linings, MF Suspended Ceilings and plaster finish throughout.

New Bond House
Project Location: Bristol
Project Contractor: Spec Projects
Project Value (C&I): £250k
Project Duration: 22 weeks (Sept 2021 – Jan 2022)
Project Scope: Conversion of existing building into Student Accommodation in central Bristol. Construction works consisted of new Internal Metal Stud Partitions, upgrade of existing walls with Insulated Wall Linings, MF Suspended Ceilings and plaster finish throughout.

Bedford Greenacre Independent School
Project Location: Bedford, Bedfordshire
Project Contractor: Pellikaan Construction
Project Value (C&I): £1.4m
Project Duration: 29 weeks (June 2024 – December 2024)
Project Scope: Working with Pellikaan Construction we produced a brand-new state of the art learning facility, representing the very latest in sustainable architecture, providing a highly technologically advanced teaching and learning environment. C&I Southwest were employed to install acoustic treatment to encase steelwork including a high level of performing Partitions between Classrooms and Auditorium learning spaces. Including acoustic ceilings throughout the building, with a high-quality Tape and Joint finish throughout.

University of the West of England (UWE) - Block W
Project Location: Frenchay, Bristol
Project Contractor: Lancer Scott
Project Value (C&I): £370k
Project Duration: 11 months (July 2023 – May 2024)
Project Scope: Working with Lancer Scott and UWE, we produced the Engineering Building for students at UWE based over four floors. Works include formal and informal educational centre to achieve a high-quality learning space. A place where students and staff come together to build engineering skill sets. C&I were contracted to install Metal Stud Linings and Partitions, Suspended Ceilings and Acoustic Baffles throughout the building.

University of the West of England (UWE) – The Bridge
Project Location: Frenchay, Bristol
Project Contractor: Beard Construction
Project Value (C&I): £250k
Project Duration: 22 weeks (April 2024 – August 2024)
Project Scope: Refurbishment and construction work to create four separate spaces within the existing Robotics Centre (T Block) at the University of the West of England. Funded by the Art and Humanities Research Council and West of England Combined Authority, the newly refurbished spaces offer 500m2 of state of state-of-the-art facilities. C&I Southwest were contracted to carry out the installation of internal SFS, Metal Stud Partitions and Suspended Ceilings including a skim finish throughout.

Beaufort House
Project Location: Exeter
Project Contractor: Iesis Urban
Project Value (C&I): £1.5million
Project Duration: 8 months (March 2024 – October 2024)
Project Scope: Refurbishment of existing building into high quality student accommodation located in central Exeter and the University Campus. Our works package included for 60-minute fire rated partitions and Suspended MF Ceilings, including 600 x 600 Suspended Ceilings to the Communal areas including the fire protection of the existing structure all completed to a high-quality plaster finish.

Armourers House
Project Location: Queen Charlotte Street, Central Bristol
Project Contractor: Iesis Urban
Project Value (C&I): £950k
Project Duration: 39 weeks (March 2025 – November 2025)
Project Scope: Refurbishment of existing 1980’s office block located in central Bristol into Student Accommodation. Our works package included for 60-minute fire rated partitions and Suspended MF Ceilings, including structural upgrading of existing floors all completed to a high quality plaster finish.

Friary House
Project Location: Southampton
Project Contractor: Spec Projects
Project Value (C&I): £900k
Project Duration: 8 months (March 2024 – October 2024)
Project Scope: Refurbishment of existing office block located in central Southampton and Solent University into Student Accommodation. Our works package included for 60-minute fire rated partitions, Suspended MF Ceilings and External Wall upgrade including a high-quality finish

South Western House
Project Location: Bournemouth
Project Contractor: Iesis Urban
Project Value (C&I): £700k
Project Duration: August 2025
Project Scope: Refurbishment of a 1960’s office block into student accommodation units to support Bournemouth University. Our works package included for 60-minute fire rated partitions, Suspended MF Ceilings and External Wall upgrade including a high-quality finish

The Foundary
Project Location: Worcester, Worcestershire
Project Contractor: Spec Projects
Project Value (C&I): £460k
Project Duration: 14 months (July 2022 – August 2023)
Project Scope: Located in central Worcester the Foundary offers student accommodation to the nearby university. C&I Southwest, were employed to board SFS partitions, install Mass Barrier Fire Ceilings, MF Plasterboard Ceilings along with 600 x 600 Grid and Tile Ceilings to communal areas of the building.

92 Redcliffe Street
Project Location: Bristol
Project Contractor: Iesis Urban
Project Value (C&I): £150k
Project Duration: 4 months (July 2025 – October 2025)
Project Scope: Located in central Bristol, Redcliffe Street offers a short walk to the nearby Bristol Campus with the added benefit from being close to nearby shops, cafes and bars. C&I Southwest installed new Metal Stud Partitions, upgraded existing floors, Suspended Ceilings with a plaster finish throughout the building.