Case Study 1

Project Name: Wapping Wharf – Phase 2

Project Location: Bristol City Centre

Project Contractor: Balfour Beatty

Project Value (C&I): £2.60 million

Project Duration: 104 weeks (Dec 2018 – Dec 2020)

Project Scope: Construction of 256 new build apartments, with our works consisting of 8000m2 Ayrshire SFS to form the outside of the building structure to two apartment blocks and then the internal Metal Stud Partitions, Insulation and Boarding including MF Ceilings and a plaster finish throughout.

Case Study 2

Project Name: Blackberry Hill.

Project Location: Manor Road, Bristol

Project Contractor: Vistry Partnerships

Project Value (C&I): £3.00 million

Project Duration: 71 weeks (March 2021 – July 2022)

Project Scope: Re-development of the existing Blackberry Hill Hospital site to create 346 new homes, including Retail and Start-up businesses. Works include treatment of existing stonework with a lime based Parge Coat then lined with Metal Studwork and Insulated Plasterboard. Form and create new Internal Metal Stud Partitions along with MF ceilings throughout and feature suspended Grid and Tile ceilings to the Corridors, Fire Protection works throughout and completed with a Tape and Joint finish

Case Study 3

Project Name: Rosemary Lodge

Project Location: Wimbledon, South West London

Project Contractor: JJ Rhatigan

Project Value (C&I): £350k

Project Duration: 50 weeks (Dec 2016 – Dec 2017)

Project Scope: Construction of five new build luxury homes set over four floors to form a basement with Staff Living Quarters, state of the art Cinema Room, luxury Kitchen / Dining Room, Drawing Room, En-Suite Bedrooms and Family Bathrooms set in Wimbledon, South West London. Works consisted of Drylining to external and internal blockwork walls, new build Metal Stud Partitions with a shadow gap detail and plaster finish throughout including feature coffered ceilings including lighting troughs to compliment the overall finish.

Case Study 4

Project Name: Coronation Road, Phase 2

Project Location: Coronation Road, Bristol

Project Contractor: Bray and Slaughter

Project Value (C&I): £750k

Project Duration: 40 weeks (Dec 2017 – Oct 2018)

Project Scope: Construction of new build Mews Houses (8) and Apartments (29) on Coronation Road, Bristol near Bristol’s Harbourside. Works consisted of new Internal Metal Stud Partitioning, Drylining, Suspended Ceilings and a Plaster finish.