Porsche Showroom
Project Location: Newport, South Wales
Project Contractor: Beard Construction Ltd
Project Value (C&I): £650k
Project Duration: 25 weeks (Aug 2023 –
Project Scope: Working with Beard to form a New Porsche Showroom, our works consist of Internal Metal Stud Wall Linings and Internal Metal Stud Partitions, Metal Pan ceilings, MF Ceilings, feature Bulkheads with a Tape and Joint Finish throughout.
Portwall Square
Project Location: Bristol
Project Contractor: Skanska
Project Value (C&I): £550k
Project Duration: August 2021 – July 2022
Project Scope: New build office block formed in central Bristol. Our works consisted of forming Insulated Wall Linings to open office areas, Internal Metal Stud Partitions and Metal Pan Suspended Ceilings to core facilities running up through the building including a tape and joint finish throughout.
Imperial Tobacco
Project Location: Bristol
Project Contractor: CBRE
Project Value (C&I): £210k
Project Duration: March 2023 – August 2023
Project Scope: Reconfiguration of existing offices, forming new Internal Partitions, Wall Linings along with Suspended Grid and Tile Ceilings to newly formed offices.
CVT Vets
Project Location: Portsmouth
Project Contractor: Lancer Scott
Project Value (C&I): £130k
Project Duration: March 2023 – June 2023
Project Scope: Conversion of a former building into a new Veterinary Surgery. Works consisted of forming new Internal Metal Stud Partitions, Wall Linings, MF Ceilings including Grid and Tile Suspended Ceiling, including a Tape and Joint Finish