St_Lukes_DLOW2343

St. Luke’s Hospital

Project Location: Headington, Oxford

Project Contractor: Benfield and Loxley

Project Value (C&I): £230k

Project Duration: 38 weeks (July 2018 – April 2019)

Project Scope: New En-Suite Bedrooms formed and built above the existing hospital, works consisted of cement board fixed to SFS, Insulation and board to the external elevation, Internal Metal Stud Partitions, MF Suspended Ceilings, Grid and Tile Ceilings, Plaster finish throughout.

St. Peter’s Hospice

St. Peter’s Hospice

Project Location: Bristol

Project Contractor: Andrew Scott Construction

Project Value (C&I): £200k

Project Duration: 35 weeks (February 2018 – October 2018)

Project Scope: New Inpatient unit to the existing St. Peter’s Hospice which include Private Bedrooms with En-Suite facilities, Lounges, Coffee Shop, Hairdressers, Staff and Admin Areas. Works consisted of Internal Metal Stud Partitions, MF Suspended Ceilings, Grid and Tile Ceilings, Plaster finish throughout.

bri

Bristol Royal Infirmary

Project Location: Bristol

Project Contractor: 21st Century Building Services Ltd

Project Value (C&I): £85k

Project Duration: 12 weeks (December 2017 – March 2018)

Project Scope: Update existing hospital ward at the BRI (Bristol Royal Infirmary), works consisting of new Partitions, Wall Linings, Ceilings with a Tape and Joint Finish

Southmead-Hospital

Southmead Hospital

Project Location: Bristol

Project Contractor: Marcon

Project Value (C&I): £60k

Project Duration: 12 weeks (December 2020 – February 2021)

Project Scope: Update existing hospital ward at Southmead Hospital, works consisting of new Partitions, Wall Linings, Ceilings and Plastering around a live hospital building.

h1

Basildon Hospital

Project Location: Basildon, Essex

Project Contractor: RDA

Project Value (C&I): £50k

Project Duration: 3 months (February 2020 – May 20202)

Project Scope: Reconfiguration of the existing hospital and relocation of the existing Kitchen and Canteen facilities, upgrading the Internal Metal Stud Partitions, insulated Wall Linings and Hygienic Grid and Tile Suspended Ceilings, with a Tape and Joint finish throughout.

Screenshot 2025-10-28 at 09.02.49

Derriford Hospital

Project Location: Plymouth

Project Contractor: Tilbury Douglas

Project Value (C&I): £680k

Project Duration: 1 month (February 2025)

Project Scope: Working with Tilbury Douglas to form a new Oncology Extension featuring a Decant Linear Accelerator (LINAC) Bunker and a Brachytherapy Treatment Suite alongside Planning Areas, Examination and Recovery Rooms to provide critical delivery of radiotherapy treatment. C&I Southwest have been employed to carry out the supply and installation of the external SFS, (Structural Framing System) including internal insulation prior to external Cladding. We’ve also extended our contract to include all the internal Fire Protection Works, Stud Partitioning, Wall Linings and specialist Tape and Jointing finish along with high performing 600 x 600 Suspended Grid and Tile Ceilings.