St. Luke’s Hospital
Project Location: Headington, Oxford
Project Contractor: Benfield and Loxley
Project Value (C&I): £230k
Project Duration: 38 weeks (July 2018 – April 2019)
Project Scope: New En-Suite Bedrooms formed and built above the existing hospital, works consisted of cement board fixed to SFS, Insulation and board to the external elevation, Internal Metal Stud Partitions, MF Suspended Ceilings, Grid and Tile Ceilings, Plaster finish throughout.

St. Peter’s Hospice
Project Location: Bristol
Project Contractor: Andrew Scott Construction
Project Value (C&I): £200k
Project Duration: 35 weeks (February 2018 – October 2018)
Project Scope: New Inpatient unit to the existing St. Peter’s Hospice which include Private Bedrooms with En-Suite facilities, Lounges, Coffee Shop, Hairdressers, Staff and Admin Areas. Works consisted of Internal Metal Stud Partitions, MF Suspended Ceilings, Grid and Tile Ceilings, Plaster finish throughout.

Bristol Royal Infirmary
Project Location: Bristol
Project Contractor: 21st Century Building Services Ltd
Project Value (C&I): £85k
Project Duration: 12 weeks (December 2017 – March 2018)
Project Scope: Update existing hospital ward at the BRI (Bristol Royal Infirmary), works consisting of new Partitions, Wall Linings, Ceilings with a Tape and Joint Finish

Southmead Hospital
Project Location: Bristol
Project Contractor: Marcon
Project Value (C&I): £60k
Project Duration: 12 weeks (December 2020 – February 2021)
Project Scope: Update existing hospital ward at Southmead Hospital, works consisting of new Partitions, Wall Linings, Ceilings and Plastering around a live hospital building.

Basildon Hospital
Project Location: Basildon, Essex
Project Contractor: RDA
Project Value (C&I): £50k
Project Duration: 3 months (February 2020 – May 20202)
Project Scope: Reconfiguration of the existing hospital and relocation of the existing Kitchen and Canteen facilities, upgrading the Internal Metal Stud Partitions, insulated Wall Linings and Hygienic Grid and Tile Suspended Ceilings, with a Tape and Joint finish throughout.

Derriford Hospital
Project Location: Plymouth
Project Contractor: Tilbury Douglas
Project Value (C&I): £680k
Project Duration: 1 month (February 2025)
Project Scope: Working with Tilbury Douglas to form a new Oncology Extension featuring a Decant Linear Accelerator (LINAC) Bunker and a Brachytherapy Treatment Suite alongside Planning Areas, Examination and Recovery Rooms to provide critical delivery of radiotherapy treatment. C&I Southwest have been employed to carry out the supply and installation of the external SFS, (Structural Framing System) including internal insulation prior to external Cladding. We’ve also extended our contract to include all the internal Fire Protection Works, Stud Partitioning, Wall Linings and specialist Tape and Jointing finish along with high performing 600 x 600 Suspended Grid and Tile Ceilings.