r7

Scala

Project Location: Bath

Project Contractor: Spec Projects

Project Value (C&I): £600k

Project Duration: 9 months (January 2023 – Sept 2023)

Project Scope: Mixed development of new and conversion of existing building into Student Accommodation, Retail Space and Dance Studio in Bath. Construction works consist of new Metal Stud Partitions, Walling Linings, upgrade of existing building, MF ceilings and plaster finish throughout.

r6

College Green

Project Location: Bristol

Project Contractor: Spec Projects

Project Value (C&I): £250k

Project Duration: 32 weeks (April 2022 – Nov 2022)

Project Scope: Conversion of existing building into Student Accommodation in central Bristol. Construction works consisted of new Internal Metal Stud Partitions, upgrade of existing walls with Insulated Wall Linings, MF Suspended Ceilings and plaster finish throughout.

r4

New Bond House

Project Location: Bristol

Project Contractor: Spec Projects

Project Value (C&I): £250k

Project Duration: 22 weeks (Sept 2021 – Jan 2022)

Project Scope: Conversion of existing building into Student Accommodation in central Bristol. Construction works consisted of new Internal Metal Stud Partitions, upgrade of existing walls with Insulated Wall Linings, MF Suspended Ceilings and plaster finish throughout.

Screenshot 2025-10-28 at 08.41.26

Bedford Greenacre Independent School

Project Location: Bedford, Bedfordshire

Project Contractor: Pellikaan Construction

Project Value (C&I): £1.4m

Project Duration: 29 weeks (June 2024 – December 2024)

Project Scope: Working with Pellikaan Construction we produced a brand-new state of the art learning facility, representing the very latest in sustainable architecture, providing a highly technologically advanced teaching and learning environment. C&I Southwest were employed to install acoustic treatment to encase steelwork including a high level of performing Partitions between Classrooms and Auditorium learning spaces. Including acoustic ceilings throughout the building, with a high-quality Tape and Joint finish throughout.

Screenshot 2025-10-28 at 08.44.58

University of the West of England (UWE) - Block W

Project Location: Frenchay, Bristol

Project Contractor: Lancer Scott

Project Value (C&I): £370k

Project Duration: 11 months (July 2023 – May 2024)

Project Scope: Working with Lancer Scott and UWE, we produced the Engineering Building for students at UWE based over four floors. Works include formal and informal educational centre to achieve a high-quality learning space. A place where students and staff come together to build engineering skill sets. C&I were contracted to install Metal Stud Linings and Partitions, Suspended Ceilings and Acoustic Baffles throughout the building.

Screenshot 2025-10-28 at 08.46.37

University of the West of England (UWE) – The Bridge

Project Location: Frenchay, Bristol

Project Contractor: Beard Construction

Project Value (C&I): £250k

Project Duration: 22 weeks (April 2024 – August 2024)

Project Scope: Refurbishment and construction work to create four separate spaces within the existing Robotics Centre (T Block) at the University of the West of England. Funded by the Art and Humanities Research Council and West of England Combined Authority, the newly refurbished spaces offer 500m2 of state of state-of-the-art facilities. C&I Southwest were contracted to carry out the installation of internal SFS, Metal Stud Partitions and Suspended Ceilings including a skim finish throughout.

Screenshot 2025-10-31 at 08.15.01

Beaufort House

Project Location: Exeter

Project Contractor: Iesis Urban

Project Value (C&I): £1.5million

Project Duration: 8 months (March 2024 – October 2024)

Project Scope: Refurbishment of existing building into high quality student accommodation located in central Exeter and the University Campus. Our works package included for 60-minute fire rated partitions and Suspended MF Ceilings, including 600 x 600 Suspended Ceilings to the Communal areas including the fire protection of the existing structure all completed to a high-quality plaster finish.

Screenshot 2025-10-31 at 08.20.34

Armourers House

Project Location: Queen Charlotte Street, Central Bristol

Project Contractor: Iesis Urban

Project Value (C&I): £950k

Project Duration: 39 weeks (March 2025 – November 2025)

Project Scope: Refurbishment of existing 1980’s office block located in central Bristol into Student Accommodation. Our works package included for 60-minute fire rated partitions and Suspended MF Ceilings, including structural upgrading of existing floors all completed to a high quality plaster finish.

Screenshot 2025-10-31 at 08.28.21

Friary House

Project Location: Southampton

Project Contractor: Spec Projects

Project Value (C&I): £900k

Project Duration: 8 months (March 2024 – October 2024)

Project Scope: Refurbishment of existing office block located in central Southampton and Solent University into Student Accommodation. Our works package included for 60-minute fire rated partitions, Suspended MF Ceilings and External Wall upgrade including a high-quality finish

Screenshot 2025-10-31 at 08.29.59

South Western House

Project Location: Bournemouth

Project Contractor: Iesis Urban

Project Value (C&I): £700k

Project Duration: August 2025

Project Scope: Refurbishment of a 1960’s office block into student accommodation units to support Bournemouth University. Our works package included for 60-minute fire rated partitions, Suspended MF Ceilings and External Wall upgrade including a high-quality finish

Screenshot 2025-10-31 at 08.33.01

The Foundary

Project Location: Worcester, Worcestershire

Project Contractor: Spec Projects

Project Value (C&I): £460k

Project Duration: 14 months (July 2022 – August 2023)

Project Scope: Located in central Worcester the Foundary offers student accommodation to the nearby university. C&I Southwest, were employed to board SFS partitions, install Mass Barrier Fire Ceilings, MF Plasterboard Ceilings along with 600 x 600 Grid and Tile Ceilings to communal areas of the building.

Screenshot 2025-10-31 at 08.35.09

92 Redcliffe Street

Project Location: Bristol

Project Contractor: Iesis Urban

Project Value (C&I): £150k

Project Duration: 4 months (July 2025 – October 2025)

Project Scope: Located in central Bristol, Redcliffe Street offers a short walk to the nearby Bristol Campus with the added benefit from being close to nearby shops, cafes and bars. C&I Southwest installed new Metal Stud Partitions, upgraded existing floors, Suspended Ceilings with a plaster finish throughout the building. 