Sparkhill Leisure Centre
Start date: Dec 2016 – Completion date: Jul 2017
Location: Birmingham
Main Contractor: Pellikaan
Value: £250,000.00
Scope of works: set over two floors consisting of swimming pool areas, gym, studio rooms and changing rooms. Installation of high specification components were required to the pool area to serve to pool environment and sound proofing between the different functioning rooms. The works consisted of Partitioning, Mf ceilings, Suspended ceilings, Plastering, Drylining, Plastering, Tape and Jointing.
Location: Birmingham
Main Contractor: Pellikaan
Value: £250,000.00
Scope of works: set over two floors consisting of swimming pool areas, gym, studio rooms and changing rooms. Installation of high specification components were required to the pool area to serve to pool environment and sound proofing between the different functioning rooms. The works consisted of Partitioning, Mf ceilings, Suspended ceilings, Plastering, Drylining, Plastering, Tape and Jointing.